LA SEWERS


CITY OF LOS ANGELES
DEPARTMENT OF PUBLIC WORKS

Search
Advanced
ABOUT THE CITY'S SEWER SYSTEM
CURRENT SEWER CONSTRUCTION PROJECTS
  Air Treatment Facility - La Cienega and Jefferson
  Alvarado Crandall Relief Sewer
  Avenue 45 – Arroyo Drive Relief Sewer
  Buchanan Relief Sewer
  Lower North Outfall Sewer Rehabilitation Project –Phase 2
Silver Lake Area Sewer Replacement Project
Scroll Scroll list below to select an SSRP project.
FUTURE SEWER CONSTRUCTION PROJECTS
LATERAL ROOT NOTIFICATION PROGRAM
FATS, OIL AND GREASE PROGRAM
SPILLS & BACKWATER VALVES
ODORS

 
Project Information from the Bureau of Engineering

City Sewers Current Construction

Mandeville Canyon Road and Westridge Road Sewer Rehabilitation Project

Sewer pipe rehabilitation work begin in early 2008. The project is located in Brentwood and Pacific Palisades. The approximate boundary of the project is Cordelia on the north, Rockingham Avenue on the east, Reseda Boulevard on the west, and Napoli Drive on the south..


QUICK FACTS

  • About 3.8 miles of sewer pipes ranging from 8 inches to 10 inches in diameter will be rehabilitated or removed and replaced.
  • 10 new maintenance holes will be installed, and 3 existing maintenance holes will be upgraded.
  • Construction period: early 2008 through spring 2009.
  • Construction will generally take place Monday through Friday, from 7:00 a.m. until 5:00 p.m.
  • Estimated Cost: $2,000,000.
  • Construction methods will include sewer pipe lining (rehabilitates defective sewers without excavation and surface disruption), and sewer pipe removal and replacement (performed by “open cut” or trenching, a method that is typically used where sewers are shallow).
  • In order to minimize disruption on your street, most of the construction work at each location will be completed in about 5-10 business days.
  • Trucks and other equipment such as pipes will be used during construction, and you may see open trench excavation and debris removal.
  • Dust control will be provided in all project areas.
  • Enclosures or other barriers will be used in construction areas wherever necessary for public safety.
  • Flaggers will be used where traffic is impacted. Traffic will be restored to normal when construction has been completed at the end of each workday.
  • Trash pickup, deliveries, access to businesses and residential driveways will be maintained.
  • Parking may be temporarily restricted in some areas, and signs will be posted in advance telling you where and when.
  • You will be notified 24-48 hours in advance whenever sewer services may be temporarily interrupted.

 


CONTACT  AND  INFORMATION
Report Sewer ODORS
Report Sewer SPILLS   Or CALL 311, or (213) 473-3231
More information: (213) 978-0333,
or email pao@lacity.org