LA SEWERS


CITY OF LOS ANGELES
DEPARTMENT OF PUBLIC WORKS

Search
Advanced
ABOUT THE CITY'S SEWER SYSTEM
CURRENT SEWER CONSTRUCTION PROJECTS
  Air Treatment Facility - La Cienega and Jefferson
  Alvarado Crandall Relief Sewer
  Avenue 45 – Arroyo Drive Relief Sewer
  Buchanan Relief Sewer
  Lower North Outfall Sewer Rehabilitation Project –Phase 2
Silver Lake Area Sewer Replacement Project
The Secondary Sewer Renewal Program (SSRP)
Scroll Scroll list below to select an SSRP project.
FUTURE SEWER CONSTRUCTION PROJECTS
LATERAL ROOT NOTIFICATION PROGRAM
FATS, OIL AND GREASE PROGRAM
SPILLS & BACKWATER VALVES
ODORS

 
Project Information from the Bureau of Engineering

City Sewers Current Construction

Golden State and I-10 Freeway Sewer Rehabilitation Project

This sewer pipe rehabilitation project in Boyle Heights and Lincoln Heights began in early 2008. The approximate project boundary is Zonal Ave. on the north, Chicago St. on the east, Mission Rd. on the west, and Cesar Chavez Ave. on the south.


QUICK FACTS

  • About 1/2 mile of sewer pipes ranging from 6 to 8 inches in diameter will be rehabilitated or removed and replaced.
  • One maintenance hole will be rebuilt.
  • Construction period: early 2008 through summer 2009.
  • Construction will generally take place Monday through Friday, from 7:00 a.m. until 5:00 p.m. Construction on the following streets will be limited from 9:00 a.m. to 3:00 p.m. - State St. between City View Ave. and Sheridan St.; Mission Rd. between Richmond St. and Gallardo St.; and Cesar Chavez Ave. between Warren St. and Bridge St.
  • Estimated Cost: $554,000.
  • Construction methods will include sewer pipe lining (rehabilitates defective sewers without excavation and surface disruption), and sewer pipe removal and replacement (performed by “open cut” or trenching, a method that is typically used where sewers are shallow).
  • In order to minimize disruption on your street, most of the construction work at each location will be completed in about 5-10 business days.
  • Trucks and other equipment such as pipes will be used during construction, and you may see open trench excavation and debris removal.
  • Dust control will be provided in all project areas.

 


 
CONTACT  AND  INFORMATION
Report Sewer ODORS
Report Sewer SPILLS   Or CALL 311, or (213) 473-3231
More information: (213) 978-0333,
or email pao@lacity.org
City of Los AngelesDepartment of Public Works  BUREAU OF SANITATION
 BUREAU OF ENGINEERING
 CONTRACT ADMINISTRATION