|
Electrical
Plan Check
Counter
Plan Check
Offers the convenience and expedience of having a plan review
and obtaining a permit without the need to make an appointment.
It also allows applicants to interact with the plan check
engineer right there a the public counter. The type of plans
that are typically reviewed at the counter are small and medium
size projects, such as tenant improvements, small office and
retail buildings that can be reviewed in approximately 45-60
minutes. Counter plan check is offered at our Metro, Van Nuys,
and W.L.A. Construction Service
Centers.
The
following are examples of projects that are usually reviewed
at the counter.
- Tenant
improvements
- Electrical
Service and Fault Current calculations for shell buildings
- Service
design and general lighting load calculations for restaurants,
retail stores, offices, and apartments
- Emergency
and standby power sources
- Fire
alarm control systems
- T-24
and emergency lighting compliance
Regular
Plan Check
Large, more complex, or projects requiring time consuming
review are submitted for regular plan check. At the time of
submittal, plan are screened for completeness and the appropriate
plan check fees will be required to be paid.
Depending
on the size and complexity of the project, the assignment
and review time could take 2-4 weeks. For major structure
such as high-rise buildings, the review time can be longer.
The
review of Regular Plan Check projects can be expedited by
paying an Expedite fee equal to 50% of the plan check fee.
Plans being expedited are usually assigned to a plan check
engineer within five working days from the time of submittal.
Plan
submittals for regular plan check are processed at our Metro,
Van Nuys, and W.L.A. Construction
Service Centers.
|